The 2-Minute Rule for Heat Interface Units
For this reason a mixing valve (V2) is launched to blend Key water through the central plant with return h2o from the dwelling heating program, therefore allowing the HIU to satisfy differing needs dictated by DHW and Room heating. On top of that, A 3 port Manage valve is required to divert circulation concerning the DHW plate heat exchanger and dw